Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Ware River Intake Works, Shaft 8, Barre, Mass., Sep. 19, 1930
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Ware River Intake Works, Shaft 8, Barre, Mass., Sep. 19, 1930
Item Information
Title:
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Ware River Intake Works, Shaft 8, Barre, Mass., Sep. 19, 1930
No Copyright - United States
No known copyright restrictions.
No known restrictions on use.
Notes:
Title supplied by cataloger.
Print in album volume MDWSC, Contract 19, Ware River Intake Works Wachusett Coldbrook Tunnel, Volume 1, Chief Engineer set
Typed on back: Inside intake building. Lower pit, showing two of the Dow valves. The valve on the left is the one containing the Venturi meter. The sloping pipe in the foreground is the West Construction Company's pipe for delivering concrete to the bottom of the shaft.
Notes (acquisition):
Massachusetts Metropolitan District Commission; Massachusetts Department of Conservation and Recreation