Search

Search Constraints

Your search: More Like commonwealth:0g357n089 Remove constraint More Like: commonwealth:0g357n089

Search Results

43. Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, temporary timbering, Sta. 876+56 to 876+82, looking east, west heading, Shaft 9, Coldbrook-Swift...

45. Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, vent hole between Shafts 11 and 12, showing 6 in. casing before making joint, Quabbin Aqueduct,...

46. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation...

47. Contract No. 47, Service Building and Head House at Shaft 12, Quabbin Aqueduct, Greenwich, start of work on service building at Shaft 12, Hardwick, Mass., May 20, 1936

48. Contract No. 80, High Level Distribution Reservoir, Weston, looking east in upper part of twin aqueduct from Sta. 885+70 showing concrete of arch, high level...

49. Contract No. 80, High Level Distribution Reservoir, Weston, showing left side of lower barrel of twin aqueduct line at Sta. 884+90, high level distribution reservoir,...

50. Contract No. 80, High Level Distribution Reservoir, Weston, showing left side of lower barrel, twin aqueduct line at Sta. 890+80, high level distribution reservoir,...

51. Contract No. 80, High Level Distribution Reservoir, Weston, start of transition on the east end showing seepage through concrete wall in lower barrel of the twin...

52. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, finished concrete, diversion tunnel, looking downstream from...

53. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, finished concrete, diversion tunnel, looking downstream from...

54. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, intake shaft, stream control works, Belchertown, Mass., Jun. 14,...

55. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, piers at foot of shaft, diversion tunnel, looking downstream,...

56. Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, piers at foot of shaft, diversion tunnel, looking upstream,...

57. Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, looking east from Sta. 222+50, Ware-Belchertown highway, Ware and Belchertown, Mass., Jul....