Search

Search Constraints

Your search: More Like commonwealth:9k422032s Remove constraint More Like: commonwealth:9k422032s

Search Results

61. Chicopee River, tailwater, hydroelectric station, Palmer Mills, Otis Co., drainage area = 644 square miles, flow = 5400 cubic feet per second = 8.4 cubic feet per...

62. Chicopee River, tailwater, Indian Orchard hydroelectric station of the United Electric Light Co., drainage area = 686 square miles, flow = 5300 cubic feet per second =...

63. Chicopee River, Three Rivers Dam from south side at power house (hydroelectric station), Three Rivers, Palmer, Mass., 2:35 PM, Apr. 1, 1932

64. Chicopee River, Three Rivers hydroelectric station, hand on rail indicates high water mark, Palmer, Mass., 11:10 AM, Oct. 1, 1938

65. Chicopee River, washed out canal at Bircham Bend hydroelectric station, looking upstream, Springfield, Mass., 2:25 PM, Oct. 1, 1938

67. Chicopee River, washed out fire pump station, Otis Co., Palmer Mills at Three Rivers, Palmer, Mass., 10:50 AM, Oct. 1, 1938

68. Danforth Brook above bridge on Hardwick-Gilbertville Road, drainage area = 5 square miles, flow 68 cubic feet per second = 13.6 cubic feet per second per square mile,...

69. Dike at Powder Mill dam, Barre Wool Combing Co. Ltd., looking southwesterly, South Barre, Mass., Apr. 26, 1934

72. Flooded meadow land above Otis Co., mill pond, east side, looking southwest from Ware-Gilbertville Highway, 1/2 mile above Ware Foundry Co., Ware River, Ware, Mass.,...

73. Flooded meadows above Red Bridge at Barre Plains, taken from Barre Road, Barre, Mass., 12:05 PM, Mar. 12, 1936

74. Flooded meadows at mouth of Prince River, taken from Barre Road, Barre, Mass., 12:06 PM, Mar. 12, 1936

75. Flooded meadows on south side of Chicopee Manufacturing Corp. mill pond, drainage area = 713 square miles, flow = 6650 cubic feet per second = 9.4 cubic feet per...

76. Gatehouse at Bondsville dam washed out, Bondsville, Palmer, Mass., 10:15 AM, Oct. 1, 1938 : Swift River

77. General view of dam and mill buildings, looking northwesterly, George H. Gilbert Manufacturing Co., Gilbertville, Hardwick, Mass., Jan. 22, 1940

78. George H. Gilbert Manufacturing Co., Ware dam, drainage area = 168 square miles, entire flow over dam = 1810 cubic feet per second = 10.8 cubic feet per second per...

79. G.H. Gilbert Manufacturing Co., Gilbertville, lower dam, drainage area = 161 square miles, entire flow over dam = 1790 cubic feet per second = 11.1 cubic feet per...

80. G.H. Gilbert Manufacturing Co., upper dam, drainage area = 161 square miles, flow = 1730 cubic feet per second over dam, 60 cubic feet per second through water wheels,...