Search

Search Constraints

Your search: More Like commonwealth:t148j3144 Remove constraint More Like: commonwealth:t148j3144

Search Results

43. Station #106, Ware River, West Branch at highway one half mile above mouth of East Branch, Hubbardston, Mass., Dec. 15, 1930

45. Station #123, Ware River East Branch, at Brodmerkle Bridge, first bridge on this branch above Barre Falls, Rutland, Mass., Dec. 15, 1930

46. Station #125, Ware River, East Branch, at highway bridge above East Hubbardston Pond, Princeton, Mass., Dec. 15, 1930

47. Station N-2, Swift River, lower canal, Bondsville, Palmer, Mass., 10:00 AM sample, Sep. 15, 1932

48. Ware River at Station #13, Bondsville, Palmer, Mass., Sep. 23, 1932 : Highway bridge on Palmer-Bondsville Road

50. Backwater from the Ware River in Saint William Cemetery on the Ware-Palmer Road, Ware, Mass., 4:00 PM, Mar. 19, 1936

51. Backwater from the Ware River near the Ware Motor Co. on the Ware-Palmer Road, Ware, Mass., 3:55 PM, Mar. 19, 1936

54. Burnshirt River, washed out dam at Wax Factory pond, Williamsville, Hubbardston, Mass., Oct. 11, 1938

56. Chicopee and Connecticut Rivers, Dana S. Coutney [Courtney] Co., hydroelectric station, elevation of water surface = 62.7, backwater from Connecticut River, drainage...

57. Chicopee Falls, footbridge over Chicopee River at Fisk Rubber Co., drainage area = 713 square miles, flow = 5450 cubic feet per second = 7.6 cubic feet per second per...

58. Chicopee Manufacturing Corp., canal at Units #1 and #2 headgates, flow in canal = 1900 cubic feet per second, Chicopee, Mass., 10:20 AM, Apr. 6, 1933

59. Chicopee Manufacturing Corp. dam, Chicopee River, drainage area = 713 square miles, flow over dam = 3600 cubic feet per second, through canal = 1900 cubic feet per...

60. Chicopee Manufacturing Corp., tailrace #1 and #2 Units, head-canal to tailrace 23.2ft., flow in river 5450 cubic feet per second = 7.6 cubic feet per second per square...